3-May-2018
1024 x 768 or higher
When calling assign_acct_plan_m and update_acct_plan_multi_m with Master Plans that include mandatory Supplemental Plans, and specifying a value for override_bill_thru_date, supplemental plans with the same billing interval will now be prorated up to that override_bill_thru_date. The behavior for mandatory Supplemental Plans with different billing intervals will remain the same. (TICKET-16171)
Stage Current
Stage Future
Production
Stage Current
Stage Future
Production